Neenah High School

Purpose-built spaces delivering flexibility, functionality, and student-centered design.

  1. Home
  2. Projects
  3. East
  4. Neenah High School
Market Education
Sector K-12
Status Completed

A Campus Designed to Inspire

The new 460,000-square-foot Neenah High School in Fox Crossing, WI, opened for the 2023-24 school year.  The facility features a 220-acre campus with modern, flexible learning spaces, a 3,100-capacity competition gym, an 800-seat auditorium, and extensive Career and Technical Education (CTE) areas.  Other key features: A “Spirit Concourse” acting as a central hub for students, a 4-court practice gym, a 2-court competition gym, a dedicated wrestling room, a black box theater, and an atrium with a capacity for 600 students. 

At the time, Neenah High School was the single largest multi-scope contract ALC had ever performed.  It required a lot of planning at both the management and field levels to ensure proper project flow and manpower management, as well as procuring long lead time, custom-made materials to incorporate into the project on time and on budget.   

Project Highlights

Neenah, WI

Location

$171M

Project Value

460,000 SF

Project Size

17 Months

On The Job Site

Miron Construction

General Contractor / Partner
miron-construction.com